UL  Cost  made in China - replacement parts - FM  in Niigata Japan  Standard Ductile Iron 300psi Flexible Pipe Coupling Upscale Market with top quality

We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 distinct branches. For much more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828

Solution Description

Standard Ductile Iron 300psi Adaptable Pipe Coupling From China Factory

Specification of Flexible Coupling

 

Nominal Dimension mm&solin Pipe O&periodD mm&solin Working Stress PSI&solMPa Bolt Size  Dimensions mm&solin
No&interval-Dimensions mm Ø L H
twenty five              1      33&period7        1&period327 300       2&period07 2-M10&ast45 55&time period         2&period165 95             3&period74 forty five    1&period772
32            1¼ 42&period4        1&period669 300       2&period07 two-M10&ast45 65          2&period559 105          4&period133 forty five    1&period772
40            1½ 48&period3        1&period900 300       2&period07 2-M10&ast45 seventy one&time period         2&period795 a hundred and ten          4&period331 45   1&period772
50              2 60&period3        2&period375 300       2&period07 two-M10&ast55 eighty two          3&period228 124          4&period882 45   1&period772
65            2½ 73&period0        2&period875 300       2&period07 2-M10&ast55 ninety eight          3&period858 141          5&period551 45   1&period772
sixty five          3OD 76&period1        3&period000 300       2&period07 2-M10&ast55 one hundred        3&period937  142          5&period59 45   1&period772
eighty              3 88&period9        3&period500 300       2&period07 2-M10&ast55 113        4&period449 a hundred and sixty          6&period299 forty six   1&period811
100            4 114&period3      4&period500 300       2&period07 two-M10&ast55 142        5&period59 190          7&period48 forty nine   1&period929
a hundred twenty five        5&period5OD 139&period7      5&period500 300       2&period07 two-M10&ast55 168        6&period614 218          8&period583 49   1&period929
one hundred fifty        6&period50D a hundred sixty five&period1      6&period500 300       2&period07 2-M10&ast55 194        7&period638 244          9&period606 forty nine    1&period929
150            6 168&period3      6&period625 300       2&period07 two-M10&ast55 198        7&period795 248          9&period764 49    1&period929
two hundred            8 219&period1      8&period625 300       2&period07 two-M10&ast55 256       10&period079 320         12&period598 60     2&period362
250          10 273         10&period748 300       2&period07 2-M10&ast55 328       12&period913 420         16&period535 sixty four     2&period52
300          12 323&period9      12&period752 300       2&period07 two-M10&ast55 380       14&period961 454          7&period874 sixty four     2&period52

Instanllation Instruction for Riquid & Flexible Coupling

one&period Pipe preparation Check pipe end for appropriate grove demensions and assure that pipe stop is totally free of indentations and projections that would avoid proper sealing&time period
2&period Lubricate gasket Check gasket to be confident it truly is suitable for the supposed provider&period Utilize slender lubricant to the outside the house and seal lips of the gasket&time period
three&period Gasket installation Slip the gasket more than 1 pipe&comma creating confident the gasket lip does not overhang the pipe end&period of time
4&period Alignment After aligning two pipe finishes toghther&comma pull the gasket into placement&comma centering among the grooves on every single pipe&time period The gasket need to not extend into the groove on both pipe&period of time
five&period Housing installation Remove one bolt&nut and loosen the EPT nut&time period Location one housing more than the gasket&comma producing certain the housing fit into the pipe grrooves&interval Swing the EPT housing more than the gasket and into the grooves on the two pipes&period Reinsert the bolt and connect two housing&interval
six&period Tighten nuts Firstly tighten nuts by hand and make sure oval neck bolt comple tel: +86~thirteen 0571 88828y suits into bolt gap&interval Then securely tighten nuts alternatively and similarly to specified bolt torque by utilizing spanner&period of time
seven&period Installation complete-rigid coupling For rigid coupling&comma hold the gaps in between bolt pads evenly spaced&period of time Gaskets are not able to be visible&period
8&period Installation comprehensive-adaptable coupling For adaptable coupling&comma two housing must be connected iron to iron&period of time Gaskets can not be visible&time period
Warning&colon
Suitable torquing of bolts is essential to acquire specified overall performance&period Over torquing the bolts could consequence in damage to the bolt and&solor casting which could end result in pipe joint separation&period of time Under troquing the bolts may consequence in reduce strain retention capabilities&comma decrease bend load capabilities&comma joint leakage and pipe joint separation&time period Pipe joint separation may end result in substantial home damange and serious injury&period

Selection of items

Rigid coupling&comma Adaptable coupling&comma 90° Elbow&comma 45° Elbow&comma 22&period5° Elbow&comma 11&period25° Elbow&comma Tee&comma Decreasing Tee&lparGrooved&solThreaded&rpar&comma Cross&comma Minimizing Cross&lparGrooved&solThreaded&rpar&comma Mechnical Tee&lparGrooved&solThreaded&rpar&comma Mechnical Cross&lparGrooved&solThreaded&rpar&comma U-bolted Mechnical Tee&comma Reducer&lparGrooved&solThreaded&rpar&comma Grooved Eccentric Reducer&comma Grooved Break up Flange&comma Grooved Adaptor Flange&comma Cap&period of time

In depth information

Certification &colon UL outlined & FM approved

Common grooved specifications &colon US&solINTERNATIONAL

Substance &colon Ductile Iron conforming to ASTM A536&comma Grade sixty five–45–12

Thread &colon BSPT & B EPT & NPT

Regular Coat &colon Epoxy-RAL3000

Optional &colon 1&period painted 2&perioddacromat 3&periodgalvanized

Colour &colon Crimson&comma Blue&comma Orange&comma White

Gasket &colon EPDM &sol NBR &sol Silicon Rubber

Bolts and Nuts &colon ISO 898-1class 8&period8

Payment phrase &colon  T&solT&comma EPT at sight
Package deal &colon Cartons with pallet&sol Wooden circumstance
Shipping time&colon 25-40 Days

Gasket
 

Gasket Substance Temperature Range Recommendations  Coloration
E EPDM -34ºC~&plus110ºC
&lpar-thirty~&plus230ºC&rpar
Recommend for hot water&comma dilute acid&comma oil-free of charge gasoline and other mecmicals&lparexcept for hybrocarbon&rpar within the specified temperature range&interval Not advocate for petroleum and hydrocarbon&period Green Strip
D NBR -29ºC~&plus82ºC
&lpar-20~&plus180ºC&rpar
Recommended for petroleum merchandise&comma gasoline with oil vapors&comma mineral oil and vegetable oil&period Not suggested for higher temperature materials&period of time Orange Strip
S Silicon Rubber -40ºC~&plus177ºC
&lpar-40~&plus350ºC&rpar
Recommended for substantial temperature and dry air&comma and some large temperature chemical compounds&period White

Why pick 1nuo&quest

HangZhou EPT has robust complex energy and possesses the world’s 1st-class tools and engineering&comma as properly as best testing techniques&period All rough castings of grooved fittings will be processed and made by electrical-furnace smelting&comma on-line monitoring and manage and automated molding techniques&time period Now our facilities include eleven medium frequency furnace&comma four sophisticated vertical parting molding lines and a few portray lines&time period Each customer’s specifications can be happy by customized companies&period of time

Yinuo’s ductile iron grooved fittings have successively passed the China nationwide type check&comma ISO 9001 and FM&UL approvals etc&period of time Our goods are underwritten by China Ping An Insurance coverage&lparGroup&rpar Co&period of time&commaLtd&time period The grooved pipe fittings are widely used in fire battling&comma air-conditioning&comma h2o provide&comma sewage&comma cement&comma minimal-stress steaming&comma mine piping and common piping shipping and delivery&period 

CE Certificate&UL Listed&FM Authorized

ø Corporate Eyesight&colon Where there is pipes&comma there is 1nuo&period
ø Corporate Mission&colon Connecting pipeline about the world&comma benefiting houses in each and every developing&period
ø Competitive Technique&colon To provide marketplace with ideal products&comma to earn buyers with outstanding provider&period of time
ø Core Value&colon Pragmatic honesty&comma good quality 1st&comma ongoing innovation and earn-acquire cooperation&interval
ø Quality Worth&colon We endure with top quality and build by technologies

We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 distinct branches. For a lot more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of original gear manufacturer’s (OEM) component figures or emblems , e.g. CASE® and John Deere® are for reference needs only and for indicating product use and compatibility. Our business and the outlined substitution areas contained herein are not sponsored, approved, or produced by the OEM.

UL  Cost  made in China - replacement parts - FM  in Niigata Japan  Standard Ductile Iron 300psi Flexible Pipe Coupling Upscale Market with top quality

UL  Cost  made in China - replacement parts - FM  in Niigata Japan  Standard Ductile Iron 300psi Flexible Pipe Coupling Upscale Market with top quality

UL  Cost  made in China - replacement parts - FM  in Niigata Japan  Standard Ductile Iron 300psi Flexible Pipe Coupling Upscale Market with top quality